Monday, November 30, 2009

Almost Finished

The studio is almost finished. There are just a few more things to take care of before I can move in. I took 5 images for this and merged them into an HDR. The sun coming in the door would have been way overexposed otherwise.

Wednesday, October 7, 2009

Paint

The first coats of paint were applied today. Also, I measured the room. It is 25' long by 17' 7" wide. The ceiling is 7' 5" high. It would be nice to have a higher ceiling, but there is nothing I can do about it. Once the lighting is done, I'll take a photo with all 8 lights on. They will probably just be incandescent bulbs, which I'll replace eventually with something sunlight balanced.


Thursday, September 24, 2009

Drywall is complete

The studio got drywalled today. It really brightened the room and makes it easier to see where things will go. The far right corner wall is probably where I will put the large cabinets. Then directly to the right is where my office desk will be. I wanted to take measurements, but forgot, so I will do that next time.


Saturday, September 19, 2009

Beginning

This is the beginning of GrayRox Studios. Over the last couple months my house is getting an addition. Part of that addition is going to be my new office/studio. I wanted to start this blog at the beginning and show the progress of my studio and the business.

This is what the studio looks like today.


 

created by Jim Callender, GrayRox Studios. All rights reserved.